15 lines
628 B
Markdown
15 lines
628 B
Markdown
# Station Guide — Saving and Verifying a Schedule
|
|||
|
|
|
||
|
|
After clicking Save Schedule, verify:
|
||
|
|
• the schedule name and enabled state;
|
||
|
|
• the next planned trigger time;
|
||
|
|
• the acquisition type, length, and requested rate;
|
||
|
|
• the selected target preset;
|
||
|
|
• exposure, stacking, and gain;
|
||
|
|
• the enabled output destinations;
|
||
|
|
• available internal storage;
|
||
|
|
• network availability when FTP or Monitoring is enabled.
|
||
|
|
Run a test acquisition with the same settings before leaving the schedule unattended. Confirm
|
||
|
|
that the measurements are valid and appear at every selected destination.
|
||
|
|
|
||
|
|
Source : AIMsight Station Guide, rév. 1.5
|