Commit Graph
3 Commits
Author SHA1 Message Date
maximeandClaude Opus 5.5 85e590762b Presentations for the client: Sandouville, no data-gap slide, settlements in corr_y (D-127)
The three October decks (BREITHORN, MICHIGAN, NEBRASKA) no longer criticise
the system: facts and their external cause only. Figures redrawn in corr_y
(figure-y.py), BREITHORN parallax kept. Sources and PDFs named after the
station; the charter's draft stamp reads "Sandouville".

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 17:36:25 +01:00
maximeandClaude Opus 5.5 9724ea5c3b Presentations: MICHIGAN and NEBRASKA say the redundancy is lost with two references and the correction no longer compensates "correctement"; MICHIGAN's two targets too close since the data start, jump on 5 Oct; sources compile in place in VS Code (brand/ link, Tinymist export on save)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 12:29:37 +01:00
maximeandClaude Opus 5.5 3211c9ce30 Presentations: their sources live next to each report (support/<dossier>/presentation.typ) and compile with .claude/skills/presentation/compiler.sh
The script copies the source and the folder's images into the AIMsight Typst factory, builds, puts the PDF back as presentation.pdf and reports overflowing slides. run.md: how the user edits and compiles a presentation. Skill /presentation, D-114 and CLAUDE.md updated.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 12:03:03 +01:00