# The Barcelona incident (19.09.2026)
|
||||
|
|
|
|||
|
|
The AIMsight documentation makes it its main regression case: roadmap, line 33 and §15; support context, §7-8 (example file, question "Why did D-300-A jump?"), §12.2, §16.1 and the example "Barcelona reference switching". Its data are in `data/CLARIDEN/` ("L9 BCN" export, from 17/09 22:00 to 20/09 21:50 UTC, 10-minute rate, 29 sensors including 5 references; 432 images at 10 min, one per measurement, zip times in UTC) and, coded, in case E-004 (`events/E-004/`).
|
|||
|
|
|
|||
|
|
## What is observed
|
|||
|
|
|
|||
|
|
According to the blind report of 2026-10-15 (`agent-diagnostic/rapports/2026-10-15T1346Z_CLARIDEN_19-09-matin/`), rechecked on the data:
|
|||
|
|
- around 00:00 on 19/09, the references move relative to each other (`PR-291` and `PR-293` by +0.7 px in `relative_x`, `D-302-C` motionless); `sigma0` is multiplied by ten; `corr_x` of the targets drops without their raw position moving;
|
|||
|
|
- at 06:10, the "-B" targets move alone in the image (0.8 to 1.4 px), the references motionless; `PR_BG` jumps by 17 px, its reflector is no longer visible, its `error_value` stays just under the threshold and its values (~11) are kept;
|
|||
|
|
- from 06:40 to 07:30, the 29 sensors move together (+1.8 to +4 px in `y`), then partly come back; `corr_y` keeps a step until the end of the measurements: +0.5 to +1.2 on the "-A" targets, growing with the distance to the references, and −1.0 on `D-306-B`;
|
|||
|
|
- no external cause on the images.
|
|||
|
|
|
|||
|
|
## Two readings
|
|||
|
|
|
|||
|
|
- **AIMsight documentation**: movement of the station and the camera, instability of the references (`PR_284`, `PR_291`), switches between compensation states, targets that remained measurable; *"primarily reference-network / compensation-state instability, not target tracking"*. The follow-up described is on the system side: pattern reset, reconfiguration, exclusion of `PR_284` considered, reference added.
|
|||
|
|
- **Expert** (reported by the user on 2026-10-15): the structure moved, and the camera and the references with it; the system probably overestimates the amplitude; other measurement systems on the site saw a major anomaly, and the site was interrupted; the structure is a bridge, whose arch is sagging (user, 2026-10-24). This is the diagnosis of E-004: *monitored-object motion*, real movement, intervention.
|
|||
|
|
|
|||
|
|
The two do not exclude each other: an unstable compensation distorts the amplitude of a real movement. The measurements alone do not separate the structure from the camera when everything moves together; blind, the diagnostic agent concluded a *weak/unstable reference solution*, consequence undetermined.
|
|||
|
|
|
|||
|
|
## Consequences and questions
|
|||
|
|
|
|||
|
|
- For the correction of the curves (D-044): these jumps are, for the expert, a real movement; do not remove them as an artifact. The amplitude, however, is not established.
|
|||
|
|
- Open: the documentation speaks of an SFTP export at 1 min and images at 15 min, here 10 min: is it the same set, reprocessed or not? `PR-284` is here only a local reference (`pattern_type` `ref`), outside the compensation.
|