English: files and folders renamed (acces → access, instance-de-test → test-instance, pomper → pull, …)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
maximeandClaude Opus 5.5 committed 2026-11-24 17:08:22 +01:00
1 parent b9dddaf221
commit 11a59d2d24
160 files changed
+13 -11

No files matched your search

@@ -0,0 +1,17 @@
# Station Guide — Typical Installation Procedure
• Mount the camera on a sturdy tripod rated for at least 5 kg.
• Check the live view and adjust the framing (Live View Page, see page 6).
• Check the battery charge level (Camera Management Panel, see page 10).
• Install the reflectors on the structure and place reference reflectors on points considered
fixed.
• Select the reflectors in the image, assign names to them, and configure the channel
parameters (Pattern Creation Page, see page 7).
• Set the measurement frame rate (Camera Management Panel, see page 10).
• Enable image processing and verify that it keeps up with image acquisition (Camera
Management Panel, see page 10).
• Check the measurement data (Data Exploration Page, see page 12).
• Start a new acquisition, perform the load test, and review the results (Data Exploration
Page, see page 12).
Source : AIMsight Station Guide, rév. 1.5