# Station Guide — Typical Installation Procedure • Mount the camera on a sturdy tripod rated for at least 5 kg. • Check the live view and adjust the framing (Live View Page, see page 6). • Check the battery charge level (Camera Management Panel, see page 10). • Install the reflectors on the structure and place reference reflectors on points considered fixed. • Select the reflectors in the image, assign names to them, and configure the channel parameters (Pattern Creation Page, see page 7). • Set the measurement frame rate (Camera Management Panel, see page 10). • Enable image processing and verify that it keeps up with image acquisition (Camera Management Panel, see page 10). • Check the measurement data (Data Exploration Page, see page 12). • Start a new acquisition, perform the load test, and review the results (Data Exploration Page, see page 12). Source : AIMsight Station Guide, rév. 1.5