# What should I check before leaving the installation site? Before leaving the site, perform at least the following commissioning checks: • Communication: verify that the station is accessible through either 4G or Ethernet, according to the intended installation configuration. • Power supply: verify that the external power supply is operating correctly, whether mains or solar. • Battery: verify that the internal battery is connected and charging. • Charging indication: check the charging / power LED. • Camera access: verify access to the camera web interface. • Image: check image quality, focus, exposure, and field of view. • Targets: verify that all required targets or prisms are clearly visible in the image. • References: verify that all selected reference targets are clearly visible. • Target identification: verify that the configured processing areas correspond to the intended physical targets. • Distances: verify that the distances from the camera to the monitored targets are known and correctly entered where required for displacement conversion. • Reference configuration: verify that a sufficient and appropriate set of reference targets has been configured. • Reference fit: verify that the reference-network fit and sigma0 are reasonable. • Acquisition: trigger at least one measurement and confirm that valid measurements are produced. • Schedule: verify that the required periodic acquisition schedule is enabled. • Data transfer: verify that data reach the intended server, FTP destination, optional AIMsight Cloud platform, or API consumer. • Timestamps: verify that exported data contain the required timestamp information and that the timezone is understood. • Alarms: where alarms are required, verify their configuration and perform a functional test whenever practical. Whenever possible, allow at least one complete scheduled measurement and data-transfer cycle to run before leaving the site. Source : AIMsight FAQ, rév. 1.5