17 lines
928 B
Markdown
17 lines
928 B
Markdown
# Station Guide — Typical Installation Procedure
|
|||
|
|
|
||
|
|
• Mount the camera on a sturdy tripod rated for at least 5 kg.
|
||
|
|
• Check the live view and adjust the framing (Live View Page, see page 6).
|
||
|
|
• Check the battery charge level (Camera Management Panel, see page 10).
|
||
|
|
• Install the reflectors on the structure and place reference reflectors on points considered
|
||
|
|
fixed.
|
||
|
|
• Select the reflectors in the image, assign names to them, and configure the channel
|
||
|
|
parameters (Pattern Creation Page, see page 7).
|
||
|
|
• Set the measurement frame rate (Camera Management Panel, see page 10).
|
||
|
|
• Enable image processing and verify that it keeps up with image acquisition (Camera
|
||
|
|
Management Panel, see page 10).
|
||
|
|
• Check the measurement data (Data Exploration Page, see page 12).
|
||
|
|
• Start a new acquisition, perform the load test, and review the results (Data Exploration
|
||
|
|
Page, see page 12).
|
||
|
|
|
||
|
|
Source : AIMsight Station Guide, rév. 1.5
|