Files
aimsight-libredesk/snippets/textes/station-guide-typical-installation-procedure.md
maximeandClaude Opus 5.5 10ed887417 Noms plus clairs : snippets/, scripts de test numérotés, verifier_ollama.py
- base_connaissances/ → snippets/ (corpus/ → textes/, instructions.md → consignes_redaction.md, decoupage.py → fichiers.py, importer.py → envoyer.py) ; python3 -m snippets.envoyer.
- instance-de-test/ : 1_demarrer.sh, 2_creer_boite_et_cle.py, 3_brancher_ia.py, 4_essayer_brouillons.py, voir_empreintes.sh, connexion_admin.py.
- ollama/verifier.py → ollama/verifier_ollama.py ; tests, tâches VS Code et docs alignés.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-12 10:27:06 +01:00

18 lines
928 B
Markdown

# Station Guide — Typical Installation Procedure
• Mount the camera on a sturdy tripod rated for at least 5 kg.
• Check the live view and adjust the framing (Live View Page, see page 6).
• Check the battery charge level (Camera Management Panel, see page 10).
• Install the reflectors on the structure and place reference reflectors on points considered
fixed.
• Select the reflectors in the image, assign names to them, and configure the channel
parameters (Pattern Creation Page, see page 7).
• Set the measurement frame rate (Camera Management Panel, see page 10).
• Enable image processing and verify that it keeps up with image acquisition (Camera
Management Panel, see page 10).
• Check the measurement data (Data Exploration Page, see page 12).
• Start a new acquisition, perform the load test, and review the results (Data Exploration
Page, see page 12).
Source : AIMsight Station Guide, rév. 1.5